青青国产视频-国产精品电影网-91最新在线-伊人狠狠操-热精品-99热91-av一级大片-国内自拍偷拍网-一级特级黄色片-日韩欧美理论片-国产偷国产偷av亚洲清高

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site

主站蜘蛛池模板: 平江县| 威宁| 贺州市| 龙州县| 宁晋县| 怀柔区| 康马县| 涡阳县| 南澳县| 巴东县| 永嘉县| 双辽市| 阳江市| 高阳县| 平远县| 临清市| 罗甸县| 宿迁市| 岑溪市| 石城县| 六安市| 东阿县| 桐乡市| 巴里| 东乌珠穆沁旗| 镇江市| 广南县| 通江县| 宝坻区| 大城县| 华阴市| 康保县| 房山区| 巴楚县| 石嘴山市| 潮州市| 大姚县| 垫江县| 富平县| 宜春市| 信宜市|