青青国产视频-国产精品电影网-91最新在线-伊人狠狠操-热精品-99热91-av一级大片-国内自拍偷拍网-一级特级黄色片-日韩欧美理论片-国产偷国产偷av亚洲清高

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site

主站蜘蛛池模板: 建瓯市| 林甸县| 临清市| 巢湖市| 临沂市| 五家渠市| 玛纳斯县| 灵宝市| 康保县| 康平县| 汤原县| 赤峰市| 特克斯县| 桦甸市| 鄂托克前旗| 皮山县| 崇义县| 武穴市| 巨野县| 宿迁市| 鲜城| 东至县| 定南县| 乐亭县| 修文县| 红河县| 福海县| 玛多县| 娱乐| 吴忠市| 凉城县| 大港区| 鸡东县| 策勒县| 水城县| 盐津县| 怀远县| 南川市| 青田县| 浪卡子县| 彰化县|